Best IAS UKPSC Coaching in Dehradun

Indian Human Spaceflight Initiative: Gaganyaan Programme

Boost to India’s Space Program

Cabinet approves Indian Human Spaceflight Initiative: Gaganyaan Programme

Two unmanned & one manned flight planned

First manned flight in 40 months

Estimates for Phase-I expenditure- Rs 9023 Crores

The Union Cabinet chaired by Prime Minister Shri Narendra Modi has approved the Gaganyaan Programme with demonstration of Indian Human Spaceflight capability to low earth orbit for a mission duration ranging from one orbital period to a maximum of seven days. A human rated GSLV Mk-lll will be used to carry the orbital module which will have necessary provisions for sustaining a 3-member crew for the duration of the mission. The necessary infrastructure for crew training, realization of flight systems and ground infrastructure will be established to support the Gaganyaan Programme. ISRO will collaborate extensively with National agencies, laboratories, academia and industry to accomplish the Gaganyaan Programme objectives.

Expenditure:

The total fund requirement for the Gaganyaan Programme is within Rs.10,000 crore and includes cost of technology development, flight hardware realization and essential infrastructure elements. Two unmanned flights and one manned flight will be undertaken as part of Gaganyaan Programme.

Benefits:

lmplementation Strategy and Targets:

Gaganyaan Programme will be a national effort in collaboration with Industry, Academia and other scientific agencies and laboratories as stake holders along with ISRO. ISRO will be responsible for realizing the flight hardware through Industry. National agencies, laboratories and Academia will participate in crew training, human life science technology development initiatives as well as design reviews. First human space flight demonstration is targeted to be completed within 40 months from the date of sanction. Prior to this, two unmanned flights in full complement will be carried out to gain confidence on the technology and mission management aspects.

Impact:

Background:

ISRO has completed the development of launch vehicle GSLV Mk-lll which has the necessary payload capability to launch a 3-member crew module in low earth orbit. ISRO has also tested the crew escape system which is an essential technology for human space flight. The aerodynamic characterization of crew module has b3een completed as part of GSLV Mk-lll X mission flight. Elements of life support system and Space suit also have been realized and tested. In addition, the orbital & re-entry mission and recovery operations have been flight demonstrated in Space Capsule Re-entry experiment (SRE) mission. ISRO has developed and demonstrated most of the baseline technologies essential for undertaking human spaceflight mission. Globally also, there is a renewed interest in undertaking manned exploration initiatives.

Exit mobile version