Part of: National Current Affairs · See also: UPSC syllabus · UKPSC syllabus
On 30 October 2026, ISRO launched GSLV-F18 from Sriharikota at 11:51 pm. The rocket placed the NVS-03 satellite in a Geosynchronous Transfer Orbit (GTO). Notably, it lifted off from the Second Launch Pad. Also, this was the 20th flight of the GSLV. Moreover, NVS-03 is the third satellite of the next-generation NavIC series. So, it ensures continuity of NavIC services.
What NVS-03 Carries
Specifically, the satellite carries an indigenous atomic clock along with procured atomic clocks. In addition, it adds an L1 signal to the existing L5 and S-band signals. Also, its coverage spans India and about 1,500 km beyond the borders. Further, PM Narendra Modi congratulated ISRO on the launch.
Orbit Raising Towards 111.75° East
Next, ISRO fired the satellite’s Liquid Apogee Motor at 4:48 pm on 31 October. The burn lasted 2,174.8 seconds. As a result, the orbit rose to about 5,477.6 km × 37,833.4 km. According to ISRO, the satellite health is normal. Further manoeuvres will take it to its geostationary slot at 111.75° East.
Why NavIC Needed NVS-03
Before this launch, only three NavIC satellites still provided services: IRNSS-1B, IRNSS-1I and NVS-01. However, standalone positioning needs at least four. Earlier, NVS-02 lifted off on GSLV-F15 on 29 January 2025. That flight was ISRO’s 100th launch from Sriharikota. Yet, a drive signal never reached the pyro valve of the oxidiser line. Hence, NVS-02 stayed stuck in an elliptical orbit. Therefore, NVS-03 will restore the minimum four-satellite constellation once it reaches its slot.
Other 2026 Navigation and Timing Milestones
Meanwhile, on 27 June 2026, an IndiGo A320 made India’s first GAGAN-guided commercial jet landing at Udaipur. Also, in July 2026, Union Minister Pralhad Joshi launched a White Rabbit-based IST dissemination network at RRSL, Bengaluru. Notably, it forms part of the “One Nation, One Time” initiative.
NVS-03 Satellite: Key Facts for Revision
- Launch: 30 October 2026, 11:51 pm, Second Launch Pad, Sriharikota
- Rocket: GSLV-F18, the 20th GSLV flight, with the CUS15 cryogenic stage
- Mass: about 2,250 kg
- Signals: L1, L5 and S
- Final slot: 111.75° East
- Series: NVS-01 (29 May 2023, GSLV-F12), NVS-02 (29 January 2025, GSLV-F15)
Why the NVS-03 Satellite Matters for UPSC and UKPSC
Notably, examiners like questions on NavIC signals, coverage and the NVS series. So, remember the L1 signal, the indigenous clock and the 111.75° East slot. Also, link NavIC with GAGAN, which ISRO and AAI built for aviation. For official updates, also visit ISRO. Next, for a related story, read about ISRO’s plan for four launch pads by 2029.
So, are you preparing for the UKPSC Upper PCS 2026 prelims? Then join our UKPSC 2026 Prelims Test Series for regular practice.
